Replacing Standing Rigging With Mast Up: Do's & Don'ts

Written by Desiree Vilar in Maintenance

Traditionally, standing rigging is replaced with the mast down; however, replacing the rigging with the mast up has become increasingly popular in recent years as it saves time and money. However, doing this requires a high level of skill and experience to avoid serious accidents or damage to the boat. In this article, we have put together a list of dos and don'ts to help you safely and effectively replace your standing rigging while keeping the mast up.

Do an inspection before you begin the replacement process and have the essential tools on hand, such as a bosun's chair, swage fittings, and proper tensioning devices. Always remember to replace one shroud at a time to keep the mast stable. To minimize risks, work with someone with experience with rigging.

After replacing the standing rigging, double-check your work to ensure that everything is installed correctly and successfully. You may want to check each fitting and connection to see if it's tight and properly aligned. Let's get to know more tips on how to increase the success rate of the replacement process.

Summary

  • Do not ignore any warning signs of wear and tear such as cracks, corrosion, or fraying.
  • Always wear personal protective equipment (PPE), such as gloves, hard hats, and safety glasses.
  • Provide training and instruction on the proper techniques and safety protocols to avoid miscommunication and confusion when working with a team.
  • Don't overload equipment, don't use damaged or worn-out equipment, and don't use equipment that is not designed for the task at hand.
  • Use a hoist to lift the mast slowly and steadily while keeping it level and centered.

Do These When Replacing Standing Rigging With Mast Up

There are several things you should do to ensure your safety and that of others involved in the replacement process:

1. Do a thorough inspection of the existing rigging

Check for any signs of wear and tear, corrosion, or damage. If you find any issues, try to address them before replacing the rigging. Always check the rig tune and tension to ensure that your current rigging is set up and tuned correctly.

Here's a more detailed list of what to inspect:

  • Inspect the mast and boom: You may want to check for any cracks, dents, or signs of corrosion on the mast and boom. Inspect the fittings and connections to ensure that they are secure and not damaged. Try to see if the [mast and boom are properly aligned and not bent or twisted.

In case you will need to replace the mast of a sailboat, here's how much you need to prepare.

  • Examine the sails: Check for any signs of wear and tear, such as holes, tears, or frayed edges. Inspect the stitching and seams to ensure that they are secure and not coming apart. Look for any signs of mold or mildew, which can indicate that the sails have not been properly stored or maintained. If the sails are damaged, you might need to purchase a new one. New sails on mid-sized boats (34') cost between $3,000-$5,000.

  • Check the running rigging: Inspect the lines and sheets for any signs of wear and tear, such as frayed or worn spots. Check the blocks and pulleys to ensure that they are functioning properly and are not worn or damaged. You might need to ensure that all knots and splices are secure and not coming undone.

2. Use the right equipment and tools for the job

Use slings, chains, pins, and other lifting devices that are rated for the weight of the load. Use a hoist that has a rated capacity that is greater than the weight of the load.

Perhaps consider also using a tagline to control the suspended load and prevent it from swinging. You can also use sling protection to prevent the sling from cutting into the rigging.

Other essential tools to have on hand include a bosun's chair, swage fittings (such as Sta-Lok or Sea Rig), and proper tensioning devices. It's also a good idea to have a halyard available for temporary mast support during the process.

3. Make safety a top priority

Your primary concern throughout the rigging replacement process should be safety, and you can ensure safety through the following:

  • Always wear personal protective equipment (PPE), such as gloves, hard hats, and safety glasses.
  • Try to keep the area around the mast clear of any obstructions.
  • Use a spreader beam to distribute the weight of the load evenly.
  • Use lifting points that are designed to handle the weight of the load.
  • Use shackles that are rated for the weight of the load.
  • Use a choke to prevent the load from slipping out of the sling.

4. Lift the load slowly and steadily

The load should be lifted slowly and steadily to avoid any sudden movements that could cause the load to swing or tip over. This could lead to damage to the boat, the mast, or even injury to the crew. Keeping the load level and centered helps maintain stability and balance during the lifting process.

You can also consider using a tagline to control the load and prevent it from swinging. A tagline is a rope that is attached to the load and is used to guide and control its movement. This can help prevent any sudden movements or swings that could cause damage or injury.

Finally, you may need to check if the weight of the load is within the working load limit (WLL) of the lifting device. The WLL is the maximum weight that a lifting device can safely handle without risking damage or failure. Exceeding the WLL can cause the lifting device to fail, which could lead to accidents or injuries.

5. Always work in a team when replacing standing rigging

Assigning specific roles and responsibilities to each team member can help ensure that everyone knows what they are supposed to do and how to do it safely. Each team member should also be able to communicate with each other clearly and effectively, using a common language and terminology.

You may also provide training and instruction on the proper techniques and safety protocols for replacing standing rigging so that everyone on the team knows how to do their job safely.

6. Keep the mast stable

To do this, you can use a sling to support the mast and prevent it from moving. A hoist can be used to lift the mast slowly and steadily while keeping it level and centered.

The hoist ensures that the mast stays in place and doesn't shift or swing during the replacement process. Additionally, you can try using a tagline to help control the mast and prevent it from swinging, which can be dangerous for those working on the boat or nearby.

The Don'ts When Replacing Standing Rigging

Here are some common mistakes that you should avoid when replacing standing rigging with mast-up rigging to ensure your safety and the safety of your crew:

1. Don't rush the job

Replacing standing rigging with mast-up rigging is a complex task that requires time, patience, and attention to detail. Don't rush the job, and don't cut corners to save time or money, as it can lead to serious problems down the line, such as rig failure or even injury.

Always try to do the job right, even if it takes longer than you anticipated. This means thoroughly inspecting the rigging, using the proper tools and materials, and following the recommended procedures. If you're unsure about any aspect of the job, don't hesitate to seek help or advice from a professional rigger or experienced sailor.

2. Don't ignore warning signs

Ignoring warning signs such as cracks, corrosion, or other signs of wear and tear can lead to serious problems with your rigging. These issues can weaken the rigging and increase the risk of failure, which can be dangerous and costly to repair.

Always inspect your rigging carefully before and after use, and address any issues promptly. Look for signs of wear and tear, such as cracks, corrosion, or fraying, and take action to repair or replace any damaged components.

Regular maintenance and inspections can help you catch problems early on before they become more serious and require more extensive repairs. It's also a good idea to keep a log of your inspections and any repairs or replacements you make, so you can keep track of the condition of your rigging over time.

3. Don't use makeshift tools or equipment

Always use proper tools and equipment that are designed for the task at hand. This helps get the job done safely and efficiently so that you don't damage your rigging or your boat in the process.

Don't overload equipment, don't use damaged or worn-out equipment, and don't use equipment that is not designed for the task at hand. Always use proper lifting techniques and ensure that equipment is properly secured before use.

4. Don't work alone

Working alone when replacing standing rigging with the mast up can be dangerous and risky. It is always recommended to work with a team of trained professionals who have experience in this field to not only help you complete the job safely and efficiently but also provide an extra layer of safety in case of an emergency.

Having a team of professionals will also help you distribute the workload and ensure that each person is assigned specific tasks that they are trained to handle. This avoids confusion and accidents caused by miscommunication or misunderstanding.

Moreover, working in a team will also provide an opportunity to learn from each other's experiences and expertise. You can share knowledge and skills, which can be helpful in future projects.

5. Don't compromise safety

Always follow safety guidelines and regulations, and ensure that everyone involved in the project is trained and equipped to work safely. Safety should always be a top priority, and everyone should be trained and equipped to work safely.

Failing to take proper safety precautions can result in serious injuries or even fatalities, which can have long-lasting consequences for individuals, families, and communities.

Tips For A Successful Replacement Process

Here are some tips to follow to ensure a successful replacement project:

  • Plan ahead: Before starting the project, make sure you have all the necessary tools and materials. You might need to plan ahead and have everything you need on hand to avoid delays or interruptions. You can also create a checklist of all the items you need, including any special tools or hardware.

  • Take breaks: Replacing standing rigging can be a physically demanding task. Try to take regular breaks to avoid fatigue and ensure that you're working safely. Take a break every hour or so to stretch your muscles, hydrate, and rest.

  • Double-check your work: Double-checking your work ensures that everything is installed correctly and securely. Check each fitting and connection to ensure that it's tight and properly aligned. Use a torque wrench to ensure that all connections are tightened to the manufacturer's specifications.

  • Test the rigging before sailing: Before heading out on the water, test the rigging to make sure that everything is working properly. Raise the sails and inspect the rigging from all angles to see that there are no twists or kinks. Check that the mast is properly aligned and that all the shrouds and stays are under tension.